FieldProofAll punch lists
Cache·AC changeout11 checks·verified Sep 4, 2026

Cache County AC changeout punch list.

We read Cache County's own published requirement on Sep 4, 2026. It is on this list.

Cache County asks for a Manual J and D form when a furnace is replaced as part of a remodel. Ask whether a bare changeout counts.

  1. 01Shoot both data plates: condenser and coil, model and serial readable.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
  2. 02Show the condenser pad level and its clearance per the listing.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
  3. 03Shoot the disconnect within sight of the condenser and the whip into the unit.NEC 2023 440.14NEC 2023, adopted by Utah Code 15A-2-103
  4. 04Say the line set size, the length and the charge you weighed in.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
  5. 05Running R-454B or another A2L? Shoot the equipment listing label.IMC 2024 1101.6 and 908.1, Utah amendmentUtah Code 15A-3-402, statewide IMC 2024 amendments
  6. 06Show the refrigerant line insulation, sealed where it enters the wall.IECC 2024 R403.4IECC 2024, adopted by Utah Code 15A-2-103
  7. 07Shoot the secondary drain pan and its float switch.IRC 2021 M1411.3.1IRC 2021, adopted by Utah Code 15A-2-103
  8. 08Say the subcooling and superheat you measured at the end.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
  9. 09Record the refrigerant recovered from the old unit.40 CFR 82 subpart FEPA 608, 40 CFR 82 subpart F
  10. 10Attach the load calculation the equipment was sized from.IRC 2021 M1401.3IRC 2021, adopted by Utah Code 15A-2-103
  11. 11Shoot the permit card posted at the job.Local permitYour local building department permit

This is documentation, not legal advice. Verify with your AHJ.

Sources

Where every line came from.

7 sources, each read on the date shown. We re-read them on a schedule and change the date, not the claim.

Manufacturer install instructions, required by IRC 2021 M1307.1
Verified Sep 4, 2026 · no public document, read at the counter
EPA 608, 40 CFR 82 subpart F
Verified Sep 4, 2026
Your local building department permit
Verified Sep 4, 2026 · no public document, read at the counter
Other lists

The rest of the library.

Every jurisdiction and job type

Take this list to your next changeout.

FieldProof checks a job against this list while your tech is still on site, then writes the packet. Running a real job is not open yet. The list is yours today.

1 job $29·10 jobs $199·30 jobs $499·job credits never expire