Weber·furnace changeout15 checks·verified Sep 4, 2026
Ogden furnace changeout punch list.
We have not verified Ogden yet. This is the Utah state list. Verify with your AHJ.
- 01Shoot the data plate: model, serial and input rating readable.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
- 02Shoot the vent termination, showing clearance to the wall and to grade.IRC 2021 G2427IRC 2021, adopted by Utah Code 15A-2-103
- 03Show the vent slope, the support and every joint fastened.IRC 2021 G2427IRC 2021, adopted by Utah Code 15A-2-103
- 04Say the combustion air opening size, or shoot the opening with a tape on it.IRC 2021 G2407IRC 2021, adopted by Utah Code 15A-2-103
- 05Shoot the sediment trap ahead of the appliance connector.IRC 2021 G2419.4IRC 2021, adopted by Utah Code 15A-2-103
- 06Show the gas shutoff valve within 6 ft. of the furnace.IRC 2021 G2420.5IRC 2021, adopted by Utah Code 15A-2-103
- 07Shoot the gas meter: protected from falling snow and ice, still accessible.IFGC 2024 404.9.1, Utah amendmentUtah Code 15A-3-501, statewide IFGC 2024 amendments
- 08Leaving a Category I furnace in an occupiable room? Shoot the CO detector and the self-closing door.IFGC 2024 503.6.11.1 exception, Utah amendmentUtah Code 15A-3-501, statewide IFGC 2024 amendments
- 09Say the manifold pressure and the temperature rise you measured.IRC 2021 M1307.1Manufacturer install instructions, required by IRC 2021 M1307.1
- 10Shoot the condensate line, its trap and where it terminates.IRC 2021 M1411.3IRC 2021, adopted by Utah Code 15A-2-103
- 11Show the electrical disconnect in sight of the furnace.NEC 2023 422.31(B)NEC 2023, adopted by Utah Code 15A-2-103
- 12Show the working space and access to the furnace kept clear.IRC 2021 M1305.1IRC 2021, adopted by Utah Code 15A-2-103
- 13Shoot the return plenum sealed and the filter rack accessible.IRC 2021 M1601.4.1IRC 2021, adopted by Utah Code 15A-2-103
- 14Attach the load calculation the equipment was sized from.IRC 2021 M1401.3IRC 2021, adopted by Utah Code 15A-2-103
- 15Shoot the permit card posted at the job.Local permitYour local building department permit
This is documentation, not legal advice. Verify with your AHJ.
Sources
Where every line came from.
5 sources, each read on the date shown. We re-read them on a schedule and change the date, not the claim.
- Manufacturer install instructions, required by IRC 2021 M1307.1
- Verified Sep 4, 2026 · no public document, read at the counter
- IRC 2021, adopted by Utah Code 15A-2-103
- Verified Sep 4, 2026
- Utah Code 15A-3-501, statewide IFGC 2024 amendments
- Verified Sep 4, 2026
- NEC 2023, adopted by Utah Code 15A-2-103
- Verified Sep 4, 2026
- Your local building department permit
- Verified Sep 4, 2026 · no public document, read at the counter
Next jurisdiction
Your inspector asks for something else?
Send us the city. We read what their building department publishes, add the lines with the citation, and date them.
Other lists
The rest of the library.
- Ogden AC changeoutRead the list
- Utah furnace changeoutRead the list
Take this list to your next changeout.
FieldProof checks a job against this list while your tech is still on site, then writes the packet. Running a real job is not open yet. The list is yours today.
1 job $29·10 jobs $199·30 jobs $499·job credits never expire